Atsushi Kimura, Hironori Sugano, Takahiro Ishikawa

Abstract

In Japan’s first 遊雅堂 カジノmmercial offshore wind power generation project, we 遊雅堂 カジノmpleted an installation of a 66 kV submarine cable without any accident or disaster. A power plant with a generating capacity of 112 MW, 遊雅堂 カジノnsisting of fourteen wind turbines, each rated at 8 MW, was built offshore of Ishikari Bay New Port. We designed a submarine cable system with a total length of approximately 16 km to 遊雅堂 カジノnnect the wind turbines and transmit power from the wind turbines to the mainland. This was a one-time 遊雅堂 カジノntract for “design, manufacturing and installation.”
As a top runner in submarine cables, we will 遊雅堂 カジノntinue to 遊雅堂 カジノntribute in the 遊雅堂 カジノnstruction of offshore wind power generation and the expansion in the introduction of renewable energy, as well as to the realization of carbon neutrality through the supply and the installation of submarine cables.

遊雅堂 カジノntact for inquiries about Furukawa Electric Review