遊雅堂 出金 キャンセルrt of page




Main Content 遊雅堂 出金 キャンセルrts

Furukawa Review No.19

In遊雅堂 出金 キャンセルllation of the World's First 500-kV XLPE Cable with Intermediate Joints

Akira Suzuki, Sh遊雅堂 出金 キャンセル'ji Nakamura, Moriaki Matsuda, Hiroshi Tanaka, Masaaki Shiomitsu, Kiyoaki Hiraga, Kiyomi Adachi, Katsuyoshi Hiratsuka, Kazuhiko Matsuda, Masashi Yagi, Akihisa Sudo, Kimiji Sugawara

Ab遊雅堂 出金 キャンセルract

Tokyo Electric Power's Kazunogawa Power 遊雅堂 出金 キャンセルtion will, when completed, be Japan's largest pumped-storage hydroelectric power 遊雅堂 出金 キャンセルtion, with an output of 1.6 GW. The first phase is currently under construction, with two 400-MW machines and one cable circuit. Using leading-edge technology Furukawa Electric has provided 500-kV XLPE cable and associated extrusion-molded joints (EMJs) and horizontal gas-immersed sealing ends (EBGs) for the No. 1 and No. 2 machines. Construction was completed in November 1998 and voltage with遊雅堂 出金 キャンセルnd tests have also been performed.
The cable for this line is 2300 m in length, longer than has ever been used in a power 遊雅堂 出金 キャンセルtion interconnect. Because of transportation constraints, insulation-type EMJs are in遊雅堂 出金 キャンセルlled at intermediate points. The line is being built under the same basic design concept and in遊雅堂 出金 キャンセルllation conditions as the Shin-Keiyo-Toyosu Line now under construction, and reflects the expertise and knowhow acquired there.
The equipment covered here is scheduled to go 遊雅堂 出金 キャンセルto service 遊雅堂 出金 キャンセル December, 1999.

Ma遊雅堂 出金 キャンセル Content ends


Sub Category Menu 遊雅堂 出金 キャンセルrts

Sub Ca遊雅堂 出金 キャンセルgory Menu ends


Bound to 遊雅堂 出金 キャンセルnovate

End of page